two tons of which triple superphosphate, in the form of ready manufactured is hoped to obtain about 43,000 tons P2O5 (90,000 form and it is assumed that this will in fact be obtained. If in adjusted. one ton of P2O5. It On this the phosphate rock requirements will have to be 177,000 tons P2O5 would involves the shipment of have to be provided in this country before the end phosphate rock which must be delivered it is not possible yet to say 532,000 tons of late one and of March. The present season is rock and manufactured superphosphate will be carried over into what stocks of phosphate likely, however, that up to 55,000 tons a month will have to be next year.