The Meeting reviewed the situation created by the intensive bombing of the last few days. The information regarding the position may be summarised as follows:- ELECTRICITY SUPPLIES. Four power stations had been damaged in greater London, but the only serious interruption had been in Fulham where supplies of current in the area affected had been fully restored from the grid that day. Two grid sub-stations had been damaged and there had been considerable damage to transmission and distribution systems in the East End of London.
electricity infrastructure housing water supply drainage evacuation fires gas ports railways homelessness london bombing essex damage to property air raids region 5: london barking bomb damage region 12: south eastern (tunbridge wells hq) disruption to services beckton fulham hammersmith air raid damage committee rest centres wapping silvertown
Civil Defence Region
Region 12: South Eastern (Tunbridge Wells HQ) Region 5: London
Collection ID
CAB71
Document Reference
CAB 71/23/3
Document Types
Summary
File Reference
CAB 71/23
Former Department Reference
ARD(40) 1st Meeting
Identifier
10.1080/wtss.cab71.000023.003
Keywords
Air Raids Bomb Damage Drainage Electricity Evacuation Fires Gas Homelessness Housing Infrastructure Ports Railways Rest Centres Water Supply
Language
English
Locations Discussed
Barking Beckton Essex Fulham Hammersmith London Silvertown Wapping
Organizations Discussed
Air Raid Damage Committee
Pages
3
Published in
United Kingdom
Series
Air Raid Damage and Shelter Policy Committee. Meetings 1(40) - 12(40); Papers 1(40) - 18(40), 11 Sept-12 Dec 1940; Papers 1(41) - 52(41), 2 Jan-24 Dec 1941; Papers 1(42) - 53(42), 1 Jan-Dec 30 1942
Themes
Bombing Damage to Property Disruption to Services